BIM ABC
The specialist vocabulary
Understand BIM
BIM is the method that supports, updates, and advises the tools
(hardware, software) and consultant services from the initiation
to the end of the lifecycle of buildings modeling, information
flow, and documentation, such as CAD 3D Model, Construction,
Costs, and Life Cycle Operations management as essential
node work of the realization represents.
BIM Primitives
01
Communication
02
Cooperation
03
Coordination
the systematic organization of issues, the
steering of groups of people and projects
and the corresponding strategic
approaches
BIM Culture
01
Improved Collaboration
02
Extension of the basis of trust
between the actors for the
common model
03
Coordination
Transparent operation Simplification of control
From A to Z
3.1.7
Building Information Modeling
(BIM Level 3, iBIM)
fully integrated, collaborative process of modeling a virtual building model in accordance with the lifecycle data maintenance execution, in a common, centralized data model incorporating factual data for further information, described as additional dimensions
3.1.6
Building Information Modeling
(BIM Level 2)
Method for creating, maintaining, and networking a cross-trade (integral) virtual CAD model, starting with the first building sketch ending with the demolition of the building
3.1.10
CAD MODEL
two- or three-dimensional digital representation of a structure, its components and the infrastructural environment, consisting of graphical and alphanumeric data
3.1.11
CAD DRAWING
two-dimensional representation of a CAD model intended for printing on paper
3.1.12
COMPUTER AIDED
DESIGN (CAD)
Computer assisted drawing of design documents for construction, mechanical, electrical or electronic products using special software
According to the life phases of a building
(ÖNORM 6241-2 – 5 life phases of a building)
The subdivision of the project phase is carried out in
1
Project initiation
The subdivision of the phase project initiation takes place in
01. Project characteristics
02. Feasibility study
03. Project description
2
Planning
The subdivision of the phase planning takes place in
01. base BIM
02. Preliminary draft – coordinated, pre-determined BIM
03. Draft – coordinated, coordinated BIM
04. Approval planning (submission planning)
05. Implementation planning
06. Tender
- Costing basics
- Scheduling
3
Procurement (time depending) on project)
Award
4
Establishment
The subdivision of the phase establishment takes place in
01. Project characteristics
Factory planning and coordinated
execution planning
02. Execution
- Site Prep
- Construction execution
- Commissioning
03. Transfer
5
Use
The subdivision of the phase utilization takes place in
01. Operation: Computer Aided
Facilities Management, (CAFM)
02. Maintenance
6
End Use
The subdivision of the phase end use
takes place in
01. Transformation
02. Disassembly